Blog_x_9-22 B3 015

BH-1 Conductor and surface hole (250m), waiting for the NRG Rover to finish at Sidewinder. Behind that is B3 (with ladder) awaiting Ensign
6 which is just pulling in as this picture was taken, and Cheal B2 and B1 behind the protective cement barricades and under the steel cages to protect those wells while we work with B3 and BH-1.